City News

Print

Road Work Completed Ahead of Schedule on Eastbound Travel Lane of W. Vista Way

Post Date:02/07/2017 5:28 PM

UPDATE 2.8.17 10:40 am

The eastbound lane of W. Vista Way has re-opened ahead of schedule. All travel lanes are open and crews have completed the road work.

 

UPDATE: February 8, 2017
Today, Wednesday, February 8, the City will be applying asphalt along W. Vista Way in the area around the sink hole which was fixed yesterday. Eastbound traffic will be detoured on W. Vista Way from Thunder Drive to Emerald Drive. Work will take place between 9 am and 2 pm today, only, with traffic control directing traffic.

The westbound one-way traffic will be maintained and neighboring buildings will have full access, traffic delays are anticipated and motorists are encouraged to use alternate routes during the work period.

For more information, please contact the City’s Public Works Department at 760.639.6176. 

 

Tuesday, February 7, 2017
A sinkhole formed on W. Vista Way in the eastbound lane between Thunder Drive (Oceanside city limits) and Cedar Road (Vista city limits) and was reported at approximately 1:15 pm this afternoon (February 7, 2017). The eastbound travel lane between Thunder Drive and Cedar Road was closed and re-opened around 4:30 pm this afternoon.

The sinkhole was approximately 4 feet by 5 feet at the surface and 8 feet by 10 feet below the surface. The hole has been filled and compacted and the road is now reopened. A 42 inch diameter metal pipe, which dates back prior to the City of Vista's incorporation in 1963, was not fitted properly to a connecting pipe and this eventually led to the sink hole being created. 

 

 

 

 

Return to full list >>